Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Ensure Thematic Area(s) have been set up.

  2. Navigate to the Indicator object and click New. 

  3. Any indicators created here will display in the Indicators Catalog on the ManageIndicators page of a project record. 

  4. To learn about creating project indicators from the Indicators Catalog.

  5. Click on the Related List tab.

  6. On the Indicator Thematic Area list, click New.

    Image Removed

    On creation of a new Indicator Thematic Area record, mark the Required field as TRUE.

Info

The checkbox field ampi__Required__c must be added to the Indicator Thematic Area Page Layout. Speak to a System Admin about configuration.

  1. Click

...

  1. Image Added
  2. Click “Save”.

  3. Navigate to the relevant Project record.

...

  1. Click on the Setup tab and scroll to Thematic Areas.

...

  1. Assign Thematic Area(s) to the Project by referring to the steps above to create a Project Thematic Area.

...

  1. Project Indicator records will be automatically created for Indicators where the assigned Thematic Area was marked as Required

...

  1. These Project Indicators will display on the Selected Indicators tab. To learn more about the ManageIndicators page, please review the Manage Indicators section.

...

  1. If a Project Thematic Area is already added to a Project, and a new Indicator is created which has an Indicator Thematic Area related to existing Project Thematic Area and is marked as Required, then the new Indicator will be added to the project as a Project Indicator.

...

  1. Existing Project Indicators with parent Indicators that have Indicator Thematic Area records are not removed from Projects when the field ampi__Required__c on Indicator Thematic Area is edited from TRUE to FALSE.

Info

By default, when a Project Thematic Area is deleted, related Project Indicators where the assigned Thematic Area was marked as Required are not deleted. This automatic deletion can be enabled through Dynamic Loader Custom Settings, wherein the related Project Indicators are also deleted. Speak to a System Admin and refer to the Installation Guide.

...